Simultaneous Multi-Path Analysis

Longest Path Analysis

Analyze multiple float paths simultaneously

Identify your true critical path and all near-critical paths in a single analysis pass. Our simultaneous multi-path analysis reveals what takes hours of manual P6 work in under 2 seconds.

  • 5+ float paths analyzed simultaneously
  • True critical path identification
  • Near-critical path detection
  • Driving relationship analysis
  • Calendar-aware calculations
Longest path analysis visualization showing critical and near-critical paths

Why Simultaneous Float Path Analysis Matters

Traditional tools analyze one path at a time, requiring hours of manual work to identify all critical and near-critical paths. Our analysis processes 5+ float paths simultaneously, showing you not just the longest path, but every path that could become critical with minor delays.

P6's critical path flag is often unreliable. Activities get incorrectly flagged, and the true driving path through your schedule can be hidden. Our analysis recalculates from first principles to show you what's really driving your end date.

5+ Paths Simultaneously

Analyze all float paths at once - no manual iteration required

True Critical Path

Bypass P6's unreliable critical flag with first-principles CPM

Near-Critical Detection

Identify paths within days of becoming critical

Under 2 Seconds

What takes hours manually happens almost instantly

Simultaneous Multi-Path Analysis

Analyze all critical and near-critical paths in one comprehensive pass

Simultaneous Multi-Path Analysis

Analyze 5+ float paths in parallel. See your critical path and all near-critical paths in one comprehensive view.

No manual iteration required - all paths analyzed at once

True Critical Path

Bypass P6's unreliable critical flag. Our CPM calculation identifies the true longest path from first principles.

Recalculates what's really driving your end date

Near-Critical Detection

Identify paths within days of becoming critical. Know your schedule risks before they become problems.

Paths with 5, 10, 15+ days float ranked and displayed

Driving Relationships

See exactly which relationships are driving each activity's dates and which have float available.

Understand predecessor/successor impacts at a glance

How It Works

01

Upload Your XER

Load your P6 schedule through the Smart Schedule Wizard

02

CPM Calculation

System performs CPM calculations from first principles

03

Simultaneous Analysis

5+ float paths identified and ranked simultaneously

04

Review Results

Interactive visualization of all driving paths

05

Export Findings

Include findings in your Executive Summary report

What You'll See

Clear visualization of your schedule's driving paths

Float Path Analysis Results

Critical: 1 PathNear-Critical: 3 PathsFloat Available: 12 Paths
Longest Path (0 Days Float)

Foundation → Steel Erection → MEP Rough-In → Interior Finishes → Commissioning

127 Activities342 Working Days • Drives Project Completion

Near-Critical Path (5 Days Float)

Site Work → Underground Utilities → Paving → Landscaping

43 Activities337 Working Days • 5 Days from Critical

Float Path (15 Days Float)

Elevator Installation → Elevator Testing → Final Inspection

18 Activities327 Working Days • Adequate Float Available

Analysis includes detailed activity-by-activity breakdown, relationship types, and calendar impacts

Built for Real-World Scheduling Challenges

Monthly Status Reports

Explain critical path status and near-critical risks to stakeholders with confidence

  • True longest path identification
  • Float consumption tracking
  • Risk path monitoring

Recovery Planning

Focus acceleration efforts on activities that will actually impact the end date

  • Identify compression opportunities
  • Evaluate fast-track options
  • Quantify recovery potential

Forensic Analysis

Document the actual driving path through historical schedules for claims support

  • Historical path comparison
  • Delay causation analysis
  • Impact quantification

"Built by a CPM scheduler with 30+ years of construction project management experience."

Patent Pending Technology

Ready to See Your True Critical Path?

Developed by Professional Schedulers, for Professional Schedulers