Analyze multiple float paths simultaneously
Identify your true critical path and all near-critical paths in a single analysis pass. Our simultaneous multi-path analysis reveals what takes hours of manual P6 work in under 2 seconds.

Traditional tools analyze one path at a time, requiring hours of manual work to identify all critical and near-critical paths. Our analysis processes 5+ float paths simultaneously, showing you not just the longest path, but every path that could become critical with minor delays.
P6's critical path flag is often unreliable. Activities get incorrectly flagged, and the true driving path through your schedule can be hidden. Our analysis recalculates from first principles to show you what's really driving your end date.
Analyze all float paths at once - no manual iteration required
Bypass P6's unreliable critical flag with first-principles CPM
Identify paths within days of becoming critical
What takes hours manually happens almost instantly
Analyze all critical and near-critical paths in one comprehensive pass
Analyze 5+ float paths in parallel. See your critical path and all near-critical paths in one comprehensive view.
Bypass P6's unreliable critical flag. Our CPM calculation identifies the true longest path from first principles.
Identify paths within days of becoming critical. Know your schedule risks before they become problems.
See exactly which relationships are driving each activity's dates and which have float available.
Load your P6 schedule through the Smart Schedule Wizard
System performs CPM calculations from first principles
5+ float paths identified and ranked simultaneously
Interactive visualization of all driving paths
Include findings in your Executive Summary report
Clear visualization of your schedule's driving paths
Foundation → Steel Erection → MEP Rough-In → Interior Finishes → Commissioning
127 Activities • 342 Working Days • Drives Project Completion
Site Work → Underground Utilities → Paving → Landscaping
43 Activities • 337 Working Days • 5 Days from Critical
Elevator Installation → Elevator Testing → Final Inspection
18 Activities • 327 Working Days • Adequate Float Available
Analysis includes detailed activity-by-activity breakdown, relationship types, and calendar impacts
Explain critical path status and near-critical risks to stakeholders with confidence
Focus acceleration efforts on activities that will actually impact the end date
Document the actual driving path through historical schedules for claims support
"Built by a CPM scheduler with 30+ years of construction project management experience."
Patent Pending Technology
Developed by Professional Schedulers, for Professional Schedulers